The company is located in the beautiful and fertile Jianghan Plain, in Xiantao City, China, a famous hometown of gymnastics, adjacent to Wuhan. The area is well connected by roads, and it takes only 70 minutes by car to reach Wuhan Tianhe International Airport, Hankou Railway Station, and Wuhan High-speed Railway Station. The Beijing-Zhuhai and Shanghai-Chengdu expressways converge here.
Factory construction schedule:
Phase I: March 2011 ACE-5 horizontal moulding line put into operation
April 2011 First processing plant put into operation
Phase II: June 2012 DISA vertical moulding line put into operation
June 2012 Second processing plant put into operation
Phase III: March 2014 ACE horizontal moulding line put into operation
May 2014 Third processing plant put into operation
Phase IV: May 2017 Fourth processing plant put into operation
October 2019 Fourth foundry put into operation
Main testing equipment: LINK3000, LINK3900 (USA); MTS (USA)
R&D capabilities: Synchronous design, development, and verification of brake discs and steering knuckles
Related tests: Thermal cracking, thermal deformation, natural frequency, static failure of brake discs; durability and failure tests for steering knuckles (braking, steering, vertical, longitudinal, lateral); normal temperature and low temperature impact tests on the steering arms.
ACE horizontal moulding lines: 2 units (Shinto, Japan), DISA vertical moulding lines: 2 units (DISA, Denmark); 16 medium-frequency induction furnaces (4×5T, 4×4T, 4×6T) (Eureka, USA); Maximum sand box size: ACE 900×800×(200-250)mm, DISA 650×535×(150-500)mm; Moulding capacity: ACE 120 moulds/hour, DISA 500 moulds/hour; Casting range: 0.5-55kg, FC150-300, FCD400-800; Monthly production capacity: 12,000 tonnes.
LocationHubei |
Registered Capital39.273 million US dollars |
Found Date2010-06-08 |